The information on the website does not constitute a public offer

iceberg.filter90@gmail.com 
vagner-ural@bk.ru


Mon.-Fri. 9.00-18.00
Lunch 13.00-14.00

г. Ekaterinburg, 15 Enthusiastov str.

Английский / Русский

Your shopping cart is empty

Main/ About the company /Realized projects

Realized projects

This section presents photos of some of the work done by our company:

Design, manufacture, supply of a reverse osmosis system with a capacity of 15 m3/h for the LIMITED LIABILITY COMPANY "MILH", Republic of Kazakhstan

Design, manufacture, supply of a reverse osmosis system with a capacity of 15 m3/h for the LIMITED LIABILITY COMPANY "MILH", Republic of Kazakhstan, Kostanay, August 2024.

Design, production, delivery of distiller with capacity of 8000 l/h for LLC “Agrofirma Ariant” September 2024.

Design, production, delivery of distiller with capacity of 8000 l/h for LLC “Agrofirma Ariant” September 2024.

Replacement of filter media in softening filters 3072 Ekaterinburg April 2024.

Replacement of filter media in softening filters 3072 Ekaterinburg April 2024.

Production, delivery, dismantling, installation and commissioning works of reverse osmosis system “Wagner-500” March 2024.

Production, delivery, dismantling, installation and commissioning works of reverse osmosis system “Wagner-500” March 2024.

Supply of water treatment system, installation and commissioning works Republic of Kazakhstan December 2023.

Supply of water treatment system, installation and commissioning works Republic of Kazakhstan December 2023.

Preparation of technological solution for reconstruction of water treatment plant in Uchaly December 2023.

Preparation of technological solution for reconstruction of water treatment plant in Uchaly December 2023.

Delivery, installation and commissioning works Yekaterinburg January 2024.

Delivery, installation and commissioning works Yekaterinburg January 2024.

Design, production, installation and commissioning works Ekaterinburg August 2023.

Design, production, installation and commissioning works Ekaterinburg August 2023.

Design of water treatment system in block-modular building for PJSC Gazpromneft Khanty-Mansiysk June-August 2023.

Design of water treatment system in block-modular building for PJSC Gazpromneft Khanty-Mansiysk June-August 2023.

Production, delivery of water distiller “Wagner 1000D” 1000 l/hour capacity with anti-scalant dosing Res. Bashkortostan June 2023.

Production, delivery of water distiller “Wagner 1000D” 1000 l/hour capacity with anti-scalant dosing Res. Bashkortostan June 2023.

Production, delivery, installation works of reverse osmosis unit “Wagner 8000 l/hour” Kemerovo June 2023 year

Production, delivery, installation works of reverse osmosis unit “Wagner 8000 l/hour” Kemerovo June 2023 year

Development of design, working and estimate documentation for “Reconstruction of water treatment unit” for a 120 MW thermal power plant located on Sak

Development of design, working and estimate documentation for “Reconstruction of water treatment unit” for a 120 MW thermal power plant located on Sakhalin Island near the village of Ilyinskoye, Tomarinsky District.

Delivery, installation and commissioning works. Specialized developer LLC GOR-STROY Yamalo-Nenets Autonomous District Ovgort village August 2022.

Delivery, installation and commissioning works. Specialized developer LLC GOR-STROY Yamalo-Nenets Autonomous District Ovgort village August 2022.

Modernization of a well Administration of Slobodo-Turinsk Rural Settlement of Slobodo-Turinsk Municipal District, Sverdlovsk Oblast April 2022 with ca

Modernization of a well Administration of Slobodo-Turinsk Rural Settlement of Slobodo-Turinsk Municipal District, Sverdlovsk Oblast April 2022 with capacity up to 2000 m3/day.

Development of working drawings and explanatory note, design of 3D model for Kamchatka sea water treatment with the capacity of 150 m3/day.

Development of working drawings and explanatory note, design of 3D model for Kamchatka sea water treatment with the capacity of 150 m3/day.

Development of working drawings and explanatory note, design of 3D model for fresh water treatment in Kamchatka region with capacity of 50 m3/day.

Development of working drawings and explanatory note, design of 3D model for fresh water treatment in Kamchatka region with capacity of 50 m3/day.

Design, supply, installation and commissioning of water treatment system in the village of Turinskaya Sloboda, Sverdlovsk region, June-July 2021.

Design, supply, installation and commissioning of water treatment system in the village of Turinskaya Sloboda, Sverdlovsk region, June-July 2021.

Design, assembly of reverse osmosis system “Wagner-10000” capacity 10 m3/hour for water bottling in Chelyabinsk region November 2020.

Design, assembly of reverse osmosis system “Wagner-10000” capacity 10 m3/hour for water bottling in Chelyabinsk region November 2020.

Design, manufacture of delivery of reverse osmosis system “Wagner-2000” on the vessel Andromeda for Shipyard “Pella” November 2020.

Design, manufacture of delivery of reverse osmosis system “Wagner-2000” on the vessel Andromeda for Shipyard “Pella” November 2020.

Audit, design, supervision, installation and commissioning of a complex water treatment system with capacity of 300m3/hour Plant in Tyumen region July

Audit, design, supervision, installation and commissioning of a complex water treatment system with capacity of 300m3/hour Plant in Tyumen region July 2020.

Supply of equipment for bottling beverages, installation works for the needs of Terekhov Alexander Sverdlovsk region, Asbest, May 2020.

Supply of equipment for bottling beverages, installation works for the needs of Terekhov Alexander Sverdlovsk region, Asbest, May 2020.

Design, production of block-modular water treatment plant for the Branch of JSC Oil and Gas Complex “Zhongman” Yamalo-Nenets AO April 2020.

Design, production of block-modular water treatment plant for the Branch of JSC Oil and Gas Complex “Zhongman” Yamalo-Nenets AO April 2020.

Design, production of block-modular water treatment plant for JSC Nedra Research and Production Center Yaroslavl region, Yaroslavl October 2019.

Design, production of block-modular water treatment plant for JSC Nedra Research and Production Center Yaroslavl region, Yaroslavl October 2019.

Design, assembly, installation and commissioning works of block-modular water treatment plant “Wagner 5m3/hour” July 2019.

Design, assembly, installation and commissioning works of block-modular water treatment plant “Wagner 5m3/hour” July 2019.

Production, assembly of reverse osmosis system “Wagner-250” with water pretreatment Republic of Kazakhstan Uralsk LLC “StekloService” May 2019.

Production, assembly of reverse osmosis system “Wagner-250” with water pretreatment Republic of Kazakhstan Uralsk LLC “StekloService” May 2019.

Design, assembly, installation and commissioning of block-modular water treatment plant April 2019.

Design, assembly, installation and commissioning of block-modular water treatment plant April 2019.

Design, production, assembly, installation works of reverse osmosis system “Wagner-10000” 10000 l/hour capacity with dosing of antiscalant, with a sys

Design, production, assembly, installation works of reverse osmosis system “Wagner-10000” 10000 l/hour capacity with dosing of antiscalant, with a system of chemical washing of membranes for JSC “Agrofirma ‘Zolotaya Balka’ Sevastopol (Republic of Crimea) October 2018.

 Administration of Oktyabrsky District, Amur Region December 2017.

Supply of equipment for water treatment of deferrization station for the borehole of the “Severny” microdistrict of the village. Ekaterinoslavka, Amur region December 2017.

Supply of water treatment system with capacity of 5 cubic meters/hour to the plant “Soft Drinks of Caucasus”, Stavropol Territory, Pyatigorsk August 2

Supply of water treatment system with capacity of 5 cubic meters/hour to the plant “Soft Drinks of Caucasus”, Stavropol Territory, Pyatigorsk August 2017.

Production, supply of water treatment system for technological production of beverages with capacity of 3 cubic meters/hour in LLC “Kalachinsk plant o

Production, supply of water treatment system for technological production of beverages with capacity of 3 cubic meters/hour in LLC “Kalachinsk plant of soft drinks” Voronezh region November 2017.

Design and delivery of reverse osmosis system Wagner-500 l/hour city. Yakutsk June 2017.

Design, production and installation of water treatment system complete with reverse osmosis system “Wagner-500” with a flow rate of 500 l/hour for production of bottled water in the Republic of Sakha (Yakutia) June 2017.

Design, installation of water treatment system for agricultural needs Wagner-250 l/hour city Aramil Sverdlovsk region April 2017.

Design, installation of water treatment system for agricultural needs Wagner-250 l/hour city Aramil Sverdlovsk region April 2017.

Reconstruction of the water treatment system of the Park Inn Hotel Nizhny Tagil with a capacity of 5 cubic meters per hour September 2016.

Reconstruction of the water treatment system of the Park Inn Hotel Nizhny Tagil with a capacity of 5 cubic meters per hour September 2016.

Production, supply of water treatment system for drinking and technical water to the State Budgetary Institution of the Republic of Sakha (Yakutia) “R

Production, supply of water treatment system for drinking and technical water to the State Budgetary Institution of the Republic of Sakha (Yakutia) “Republican Hospital № 1 - National Center of Medicine” Republic of Sakha (Yakutia), Yakutsk since August 2015.

Design, supply and installation of water treatment system for Salemal settlement of Yamalo-Nenets Autonomous District with capacity up to 20 cubic met

Design, supply and installation of water treatment system for Salemal settlement of Yamalo-Nenets Autonomous District with capacity up to 20 cubic meters per hour in 2014.

Design, supply and installation of the system for alkalinity reduction of water at Kataysk Dairy Plant. Kataysk, Kurgan region, April 2011.

Design, supply and installation of the system for alkalinity reduction of water at Kataysk Dairy Plant. Kataysk, Kurgan region, April 2011.

Our partners
Contact information

tel. +7 (992) 337-39-67
tel. +7 (992) 014-42-49 
tel. +7 (992) 012-95-51 
tel. +7 (992) 339-69-28 https://wa.me/79923396928
tel. +7 (343) 300-12-92 
vagner-ural@bk.ru, iceberg.filter90@gmail.com
Mon.-Fri. 9.00-18.00
Lunch 13.00-14.00

г. Ekaterinburg, 15 Enthusiastov str.

Данный сайт использует файлы cookie и прочие похожие технологии. В том числе, мы обрабатываем Ваш IP-адрес для определения региона местоположения. Используя данный сайт, вы подтверждаете свое согласие с политикой конфиденциальности сайта.
OK